Certificate of Acceptance

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print
At the completion of the two (2) year maintenance bond and after the appropriate follow-up inspections have verified that all infrastructure continues to meet design standards and is being properly maintained, a Certificate of Acceptance will be issued. At this point any deficiencies noted during the follow-up inspections have been corrected to the satisfaction of the city. The maintenance bond will be allowed to expire, and the city will assume the responsibility for maintenance of the infrastructure.

Certificate of Acceptance

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer