To aid in receiving approved inspections, the following checklist is helpful to see what the inspector will be reviewing.
Commercial Inspection Checklist
To receive a Certificate of Occupancy, all final inspections must be completed.
These include the following specific inspections:
Construction inspections | |||
---|---|---|---|
Drive approach R.O.W. | 5020 | Storm drain in R.O.W./Easement | 1055 |
Median opening R.O.W. | 1102 | Traffic barrier protection R.O.W | 1100 |
Paving fire lane | 1052 | Water meter pre-install R.O.W. | 1028 |
Paving site/parking lot | 1053 | Water test in R.O.W. | 1040 |
Plumbing water meter vault R.O.W. | 2045 | Water service tap R.O.W. | 1022 |
Right turn lane R.O.W. | 1101 | Sewer tap R.O.W. | 2051 |
Sewer in R.O.W./Easement | 5040 | Fire sprinkler underground | 2040 |
Sidewalk in R.O.W. | 5010 |
Plumbing Rough Inspections | |||
---|---|---|---|
Plumbing rough | 2025 | Building water | 1022 |
Building sewer | 1021 | Interceptor | 2022 |
Storm drainage | 1054 |
Pre CERTIFICATE OF OCCUPANCY inspectionS | |||
---|---|---|---|
Pre C/O meeting | 7500 | ||
Public Works water, sewer, paving final | 5050 |
final inspections | |||
---|---|---|---|
Plumbing final | 4020 | Site drainage paving letter | 9900 |
HVAC final | 4030 | Fire final | 4002 |
Electric final | 4010 | Zoning final | 4037 |
Retaining wall | 1041 | ||
Landscaping final | 4035 |
r.o.w. infrastructure final | |||
---|---|---|---|
Letter of notification As built/record drawings 2 year maintenance bonds |
5050 |
building/energy final | |||
---|---|---|---|
Building/Energy Final | 4040 |