Skip to page body Home About Us City Services Home & Community Business & Development Having Fun I Want to...
Wed, Apr 23 P/SUNNY, 86°

Note: This page is currently being updated to reflect the adoption of the 2012 International Codes.

All final inspections shall be completed prior to issuance of a Certificate of Occupancy.
These include the following specific inspections:

Pre-Construction Meetings

Construction inspections
Drive approach R.O.W. 5020 Storm drain in R.O.W./Easement 1055
Median opening R.O.W. 1102 Traffic barrier protection R.O.W 1100
Paving fire lane 1052 Water meter pre-install R.O.W. 1028
Paving site/parking lot 1053 Water test in R.O.W. 1040
Plumbing water meter vault R.O.W. 2045 Water service tap R.O.W. 1022
Right turn lane R.O.W. 1101 Water in R.O.W./Easement 5030
Sewer in R.O.W./Easement 5040 Sewer tap R.O.W. 2051
Sidewalk in R.O.W. 5010 Fire sprinkler underground 2040

Plumbing Rough Inspections
Plumbing rough 2025 Building water 1022
Building sewer 1021 Interceptor 2022
Storm drainage 1054

Pre CERTIFICATE OF OCCUPANCY inspectionS
Pre C/O meeting 7500
Public Works water, sewer, paving final 5050

final inspections
Plumbing final 4020 City public Works backflow certification 4022
HVAC final 4030 Site drainage paving letter 9900
Electric final 4010 Fire final 4002
Retaining wall 1041 Zoning final 4037
Landscaping final 4035

r.o.w. infrastructure final
Letter of notification
As built/record drawings
2 year maintenance bonds
5050

building/energy final
Building/Energy Final 4040

 


Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Download Acrobat Reader Download Flash Player Download QuickTime Download Windows Media Player Download Microsoft Silverlight Download Word Viewer Download Excel Viewer Download PowerPoint Viewer
Last updated: 12/31/2013 2:14:04 PM